From 1bdeaaca65577e8740a18de6b544ba8a54d0e533 Mon Sep 17 00:00:00 2001 From: Mohammed Omer <momer93@hotmail.com> Date: Mon, 15 Nov 2021 09:21:53 +0100 Subject: [PATCH] step by step assembl updates --- .../3DPrinter/Step by Step Assembly.md | 711 ++++++++++++------ 1 file changed, 492 insertions(+), 219 deletions(-) diff --git a/docs/machines/3DPrinter/Step by Step Assembly.md b/docs/machines/3DPrinter/Step by Step Assembly.md index 06feffa..b888b89 100644 --- a/docs/machines/3DPrinter/Step by Step Assembly.md +++ b/docs/machines/3DPrinter/Step by Step Assembly.md @@ -29,44 +29,6 @@ ## 1. Prepare printed parts -### 1.1 Z-axis lower mounts (2) - -- Parts required - - - 2x printed Z-axis lower mount - - 2x printed bearing holder - - 2x 608zz bearings - - 2x M3x20mm SHCS - - 2x M3 Nut - - 4x M5x12mm BHCS - - 4x M5 Hammernut - -- Assembly - - - Insert 2x M3 nuts - - Insert 2x M3x20mm SHCS - - Insert 1x 608zz bearing - - Insert 1x 608zz bearing into printed bearing holder - - Screw on bearing holder with bearing onto Z-axis lower mount - - Insert 4x M5x10mm BHCS - - Screw on 4x M5 hammernuts - -### 1.2 Z-axis upper mounts (2) - -- Parts required - -- 2x printed Z-axis upper mount - - 2x M3x20mm SHCS - - 2x M3 Nut - - 4x M5x10mm BHCS - - 4x M5 Hammernut - -- Assembly - - - Insert 2x M3 nuts - - Insert 2x M3x20mm SHCS - - Insert 4x M5x10mm BHCS - - Screw on 4x M5 hammernuts ### 1.3 Y-Carriage (2) @@ -117,86 +79,8 @@ -### 1.5 XY Idler Left and Right - -- Parts required - - - XY Idler Assembly Left - - Printed XY Idler - Left - - 2x M3 Nut - - M3x20mm SHCS - - M3x30mm SHCS - - 2x teethed idler Pulleys - - 4x DIN 433 M3 shim washer - - 2.5mm allen wrench -<img src="pictures/yaxis_l_xyidler_b001.svg" width="600" /> <br> - -- Step 1 - Insert 2x M3 nuts into printed XY Idler bracket - -| Step 1 - Insert M3 nuts into slots | Step 1.1 - M3 nuts inserted | -| - | - | -| <img src="pictures/yaxis_l_xyidler_c001.png" /> | <img src="pictures/yaxis_l_xyidler_c002.png" width="350" /> | - -- Step 2 - Insert 2x M3 bolts into printed XY Idler bracket - -- Insert the M3x20mm bolt till the end but do not tighten now. It will be tightened in a later step when the 10mm smooth rod is inserted -- Insert the M3x30mm bolt only halfway through - -| Insert M3 bolts | M3 bolts inserted | -| - | - | -| <img src="pictures/yaxis_l_xyidler_c003.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c004.png" width="350" /> | - -- Step 3 - Insert first teethed idler pulley - -- The teethed idler has a bore diameter of 3mm and width of 6mm - -| Insert Idler pulley | Pulley inserted | -| - | - | -| <img src="pictures/yaxis_l_xyidler_c005.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c006.png" width="350" /> | - -- Step 4 - Insert M3 Shim Washers - -| Insert 4xM3 shim washers | Washers inserted | -| - | - | -| <img src="pictures/yaxis_l_xyidler_c007.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c008.png" width="350" /> | - -- Step 5 - Insert second teethed idler pulley in SHCS - -| Insert 2nd teethed idler pulley | Insert M3x30mm SHCS till end | -| - | - | -| <img src="pictures/yaxis_l_xyidler_c009.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c010.png" width="350" /> | - -- Step 6 - Tighten M3x30mm SHCS - -- Screw in and slightly tighten the M3x30mm SHCS with an 2.5mm allen wrench -- Caution! Do not tighten to the point that the pulleys cannot spin freely! - -| Tighten Bolt with allen wrench | Finished XY Idler assembly | -| - | - | -| <img src="pictures/yaxis_l_xyidler_b006.jpg" width="350" /> | <img src="pictures/yaxis_l_xyidler_c011.png" width="320" /> | - -- Step 9 - Assemble XY Idler Right - -The XY Idler Right is a mirror copy of the XY Idler Left asembly. The required components are the same. The only difference is that the XY Idler printer XY Idler Right is a mirrored version of the XY Idler Left. - -Repeat steps 1 - 8 for the XY Idler Right assembly - -### 1.6 XY Stepper Bracket Left and Right - -- Parts required - - - Printed XY Stepper Motor Bracket - Left - - Printed XY Stepper Motor Bracket - Right - - 2x M3 Nut - - 2x M3x20mm SHCS - -- Instructions - - - Insert M3 nut into printed XY stepper brackets - - Screw in M3x20mm SHCS with 2.5mm allen wrench (Do not overtighten) - ### 1.7 Extruder Mount - Parts required @@ -229,42 +113,91 @@ Repeat steps 1 - 8 for the XY Idler Right assembly - Insert M3 Heatset inserts into printed exhaust housing - Show pictures with all the inserts to be inserted -## 2. Frame +## 2. Assemble frame + +### 2.1 Prepare brackets + +- Parts + + - 20x L brackets + - 40x set screws + - 12x corner brackets + - 24x M6x12mm SHCS + - 24x 30-M6 hammer nuts + +- Tools + + - 3mm and 4mm allen wrench + +- Instructions + + - Prepare 20x L brackets + - Insert 2x set screws into each L bracket + - Screw in set screws with 3mm Allen Wrench + - Prepare 12x Corner brackets + - Insert 2x M6x12mm SHCS into corner brackets + - Screw on 2x 30-M6 hammer nut + +### Step 2.2 Assemble side frames - Parts required - - Left Side Frame - 2x 500mm 3030 profile - 3x 340mm 3030 profile - 6x L brackets with 2x set screws each - - Right Side Frame - - 2x 500mm 3030 profile - - 3x 340mm 3030 profile - - 6x L bracket with 2x set screws each - - Left side to right side connection - - 4x 3030 profile 340mm - - 8x L bracket with 2x set screws each - - Corner brackets installation - - 12x Corner brackets each with: - - 2x M6x12mm SHCS - - 2x M6 Hammer nut - - Set Square - - Allen Wrench Sizes 2.5 and 3 - - 170mm printed spacer - - 10mm printed spacer + +**Note: ALL vertical profiles (4) are 500mm long and ALL horizontal profiles (10) are 340mm long** + +- Tools required + + - 3mm allen wrench + - Right angle set square + - 160mm printed template + - 10mm printed template - Instructions - - - Prepare 20x L brackets and 12x Corner brackets - - Insert 2x set screws into each L bracket - - Inserting set screws into L bracket - - Screwing in set screw with 3mm Allen Wrench - - Pic3 > L bracket with set screws inserted - - Pic4 > Arrows showing L bracket movement DOF - - Insert M6x12mm SHCS (2) into corner bracket - - Screw on M6 hammer nut (2) -**Note: ALL vertical profiles (4) are 500mm long and ALL horizontal profiles (10) are 340mm long** + - Install outer profiles profiles at right angle with L brackets + - Align with set square + - Tighten set screws with 3mm allen wrench + - Insert center profile with 2x L brackets and align with 160mm template + - Check squareness and tighten L bracket set screws with 3mm allen wrench + - Insert lower profile with 2x L brackets and align with 10mm printed template + - Check squareness and tighten L bracket set screws with 3mm allen wrench + - Repeat the same above procedure for right side frame which is the same as the left side frame + +### 2.3 Connect the side frames + +- Parts + + - preassembed side frames from step 2.1 + - 4x 30-340mm profiles + - 8x L brackets with 2x set screws each + + - Tools + + - Set Square + - Allen Wrench Sizes 3 and 4 mm + +- Instructions + + - Place 1x preassembled side frame flat on table + - Insert 4x L brackets into the 30-500 profiles of side frame + - Mount 4x 30-340 profiles onto the inserted L brackets + - Check squareness and tighten L bracket set screws + - Insert 4x L brackets on the previously the open ends of the mounted 4x 30-340 profiles + - Slide the second side frame onto the L brackets + - Check suareness and tighten L bracket set screws + +### 2.4 Install corner brackets + + - Corner brackets installation + - 12x 3030 corner brackets each with: + - 2x M6x12mm SHCS + - 2x M6 Hammer nuts + + +EXTRA NOTES - Assemble Left Side Frame @@ -344,106 +277,453 @@ Repeat steps 1 - 8 for the XY Idler Right assembly ## 3. Z-axis lower mounts +### 3.1 Prepare Z-axis lower mounts + - Parts required - - 2x preassembled Z axis lower mount + - 1x printed Z-axis lower mount A + - 1x printed Z-axis lower mount B + - 2x M3x20mm SHCS + - 2x M3 Nut - 4x M5x12mm BHCS - - 4x M5 Hammernut - - 62 mm printed spacer - - 3mm allen wrench + - 4x 30-M5 Hammernuts -- Assembly process - - - Use 62mm spacer to align lower Z mount to front side of frame - - Tighten 4x M5x12mm BHCS pre-installed on lower Z mount - - Install 2x M5x12mm BHCS with 2x M5 hammer nuts on underside of lower Z mount - - Install the second lower Z mount on right side following above process - -## 4. Z-axis linear rods - -- Insert 4x 8mm smooth rods into the 2x Z-axis lower mounts -- Tighten the 4x M3x25mm SHCS screw to fix the smooth rods in place - -## 5. Build Platform - -- Parts Required - - - 2x 2020 Profile 335mm long - - 2x 2020 Profile 140mm long - - 4x Printed Corner Brackets - - 2x M5x8mm BHCS - - 2x M5 Hammernut - - 4x Printed Z-Axis Bearing Holder - - 4x M5x10mm BHCS - - 4x M5 2020 Hammer Nuts - - 2x LM8UU Bearing - - 2x Printed Z Nut Bracket - - 4x M5x12mm BHCS - - 4x 2020 M5 Hammer Nuts - - Trapezoidal Lead Screw Nut - - 4x M3x12 SHCS - - 4x M3 Nut - - 4x Printed bed brackets - - 2x M5x12 BHCS - - 2x M5 2020 Hammer Nuts - - M3x40mm SHCS - - Silicon spacer - - M3 Hand tightening nut +- Tools + - 2.5mm and 3mm allen wrench - Instructions - - Insert the pre-assembled build platform into the 8mm smooth rods + - Insert M3 nuts into printed Z-axis lower mounts + - Insert 2x M3x20mm SHCS + - Note: Do not tighten! + - Insert 4x M5x10mm BHCS + - Screw on 4x 30-M5 hammernuts + - Install Z-axis lower mount A on frame using 62mm printed template + - Tighten the 2x BHCS with 3mm allen wrench + +### Step 3.2 Prepare lead screw bearing holders -## 6. Z-axis upper mounts - -- Parts required +- Parts - - 2x preassembled Z upper mount + - 2x printed lead screw bearing holder bot + - 2x printed lead screw bearing holder top + - 4x 608zz bearings - 4x M5x12mm BHCS - - 4x M5 Hammernut - - 62 mm printed spacer + - 4x 30-M5 Hammernuts + +- Tools + + - 3mm allen wrench + +- Instructions + + - Insert 1x 608zz bearing into printed lead screw bearing holder top + - Insert 1x 608zz bearing into printed lead screw bearing holder bot + - Screw on lead screw bearing holder top into lead screw bearing holder bot + +### 3.3 Install Z-axis lower mounts on frame + +- Parts + + - 1x prepared Z axis lower mount A + - 1x prepared Z axis lower mount B + - 2x prepared lead screw bearing holder assembly + - 62mm printed template + - 115mm printed template + +- Tools + - 3mm allen wrench - Instructions - - Use 62mm printed spacer to align upper Z mount to front side of frame - - Tighten 4x M5x12mm BHCS pre-installed on upper Z mount with 3mm allen wrench - - Install 2x M5x12mm BHCS with M5 hammer nut on underside of upper Z mount - - Install the second upper Z mount on right side following above process + - Mount Z axis lower mount A on frame with 62mm template measuring from front side of frame + - Tighten 2x BHCS with 3mm allen wrench + - Mount Z axis lower mount B on frame with 115mm template measuring from Z axis lower mount A + - Tighten 2x BHCS with 3mm allen wrench + - Install 1x lead screw bearing holder with 2x M5x12mm BHCS and 2x 30-M5 hammer nuts in the middle of both Z-axis lower mounts + - Install 1x lead screw bearing holder on opposide side of the first one on other side of frame + - Tighten 2x BHCS with 3mm allen wrench +## 4. Dual Z drive unit (DZD) -## 7. Dual Z drive (DZD) +### 4.1 Assemble dual Z drive - Parts required - Printed DZD Housing - Printed DZD Cover - 7x M3 nuts - - 2x Smooth idler pulley - - 1x Teethed idler pulley + - 2x smooth idler pulley + - 1x teethed idler pulley - Nema 17 Motor - - Drive pulley + - drive pulley - 3x M3x18mm SHCS - 2x M3x20mm SHCS + - 1100 mm long closed loop belt - 2x 300mm long 8mm dia lead screw - - 1100 mm Long closed loop belt - 2x 40T teethed 8mm bore drive pulley +- Tools + + - 2.5mm allen wrench + - Instructions - Step 1 - Insert 7x M3 nuts into DZD housing - Step 2 - Insert drive pulley on Nema 17 motor - - Step 3 - Mount Nema 17 motor on DZD housing + - Step 3 - Mount DZD housing on Nema 17 motor - Insert M3xjjmm SHCS to fasten Nema 17 motor to housing - tighten with 2.5mm allen wrench - - Step 4 - Insert idler pulleys - - Step 5 - Place DZD top cover on housing + - Step 4 - Insert idler pulleys in DZD housing + - Step 5 - Insert 1100mm closed loop belt around pulleys into housing + - Step 6 - Place DZD top cover on housing + - Step 7 - + +### 4.2 Install dual Z drive on frame + +Parts + +- assembled dual Z drive (DZD) +- printed 118mm template +- 2x M5x12mm BHCS +- 2x 30-M5 hammer nuts + +Tools + +- 3mm allen wrench + +Instructions + +- Prepare dual Z drive by inserting 2x M5x12 BHCS and 2x 30-M5 hammernuts +- Install assembled Dual Z drive on lower profile on back side of frame +- Use printed template to align housing and tighten 2x M5 bolts with 3mm allen wrench + + +### 4.3 Install Z drive belt + +Parts + +- assembled dual Z drive +- 2x 40 teeth pulleys +- 2x 8mm lead screws + +Tools + +- 1.5mm allen wrench -## 7.1. Insert Lead Screws +Instructions -## 8. Y-axis Left and Right +- Wrap DZD belt around 1x 40 teeth pulley and insert into lead screw bearing holder +- tighten lead screw bearing holder top to prevent pulley from moving out +- perform same operation on the other loop of belt in the second lead screw bearing holder +- Insert lead screws into lead screw bearing holders from bottom of frame untill one end is flush with bottom of lead screw bearing holder bot +- tighten the 2x set screws on each of the 40 teeth pulleys with 1.5mm allen wrench + + +## 5. Z-axis smooth rods + +Parts + +- 2x 320mm long 8mm smooth rods + +Tools + +- 2.5mm allen wrench + +Instructions + +- Insert 2x 8mm smooth rods into the 2x Z-axis lower mounts on left side of frame +- Tighten the 2x M3x25mm SHCS screws on each of the Z-axis lower mountsd to fix the smooth rods in place + + +## 6. Install bottom enclosure + +Parts + +- Bottom plate +- 4x M5x12 BHCS +- 4x 30-M5 hammernuts + +Tools + +- 3mm allen wrench + +Instructions + +- Preassemble 4x M5x12mm BHCS and 4x 30-M5 hammernuts on bottom enclosure plate +- Install bottom enclosure plate on bottom profiles of frame +- Tighten the 4x M5x12mm BHCS with 3mm allen wrench + +## 7. Build Platform + +### 7.1 Assemble build platform structure + +Parts + +- 2x 2020 Profile 335mm long +- 2x 2020 Profile 140mm long +- 4x aluminium 2020 corner brackets +- 2x printed Z-Axis Bearing Holder A +- 2x printed Z-Axis Bearing Holder B +- 4x LM8UU bearings +- 16x M5x10mm BHCS +- 16x 20-M5 Hammernuts +- 8x M4x8mm BHCS +- 8x 20-M4 Hammernuts + +Tools + +- 3mm and 2.5mm allen wrench +- L set square + +Instructions + +- + +### 7.2 Installing bed brackets + +Parts + +- 4x printed bed brackets +- 8x M5x10mm BHCS +- 8x 20-M5 hammernuts +- 52.5mm printed template + +Tools + +- 3mm allen wrench + +Instructions + +- prepare the 4x bed brackets by inserting 1x M5x10mm BHCS and 1x 20-M5 hammernut on the closed hole of each bed bracket +- Use the 52.5mm printed template to install the bed brackets 52.5mm from outer profile edge and tighten the M5x10mm BHCS with 3mm allen wrench +- Insert 1x M5x10mm BHCS and 1x 20-M5 hammernut assembly into the open hole of each of the 4 bed brackets +- tighten all bolts with 3mm allen wrench + +### 7.3 Installing Z nut brackets + +Parts + +- 2x printed Z Nut brackets +- 8x M5x10mm BHCS +- 8x 20-M5 hammernuts + +Tools + +- 3mm allen wrench + +Instructions + +- Prepare 2x printed Z nut brackets by screwing on 2x M5x10mm BHCS and 30-M5 hammernuts into the closed holes of each nut bracket +- Install the 2x Z nut brackets inbetween the previously installed Z-axis bearing holders A and B, one on each side +- Tighten the 2x M5x10mm BHCS with 3mm allen wrench and insert 2x M5x10mm BHCS and 2x 20-M5 hammernut sddrmbly into the 2x open holes of each Z nut bracket +- Tighten all BHCS with 3mm allen wrench + +### 7.4 Installing heat bed + +Parts + +- Prewired Mk3 24V (120W) 214x214mm aluminium heatbed +- 4x M3x40mm SHCS +- 4x silicon spacers +- 4x M3 Knurled Nut +- 3mm glass plate +- 4x glass clips + +Tools + +- 2.5mm allen wrench + +Instructions + +- Install the prewired MK3 heatbed onto the bed brackets with 4x M3x40mm SHCS, 4x silicon spacers and 4x M3 knurled nuts +- Handtighten the nuts +- Place glass plate on aluminium heatbed and install 4x glass clips to hold glass in place + +### 7.5 Slide build platform onto Z axis smooth rods + +Parts + +- Preassembled build platform + +Instructions + +- Insert the pre-assembled build platform into the 8mm smooth rods + +### 7.6 Installing lead screw nuts + + Parts + +- 2x Trapezoidal Lead Screw Nuts +- 4x M3x12 SHCS +- 4x M3 Nut + +Tools + +- 2.5mm allen wrench + +Instructions + +- Screw down lead screw nuts from top of lead screws untill they reach the printed Z nut bracket on build platform +- With build platform on bottommost position, rotate both lead screws till their starting threads are on same starting point +- Insert 2x M3x12mm SHCS into holes of each lead screw nut and fasten with M3 nuts on bottom side + +## 8. Z-axis upper mounts + +### 8.1 Prepare Z-axis upper mounts + +Parts + +- 1x printed Z-axis upper mount A +- 1x printed Z-axis upper mount B +- 2x M3x20mm SHCS +- 2x M3 nut +- 2x M5x12mm BHCS +- 2x S8-M5 Hammernut + +Tools + +- 2.5mm allen wrench + +Instructions + +- Insert 1x M3 nut and 1x M3x20mm SHCS into both Z-axis upper mounts +- Handtighten the M3x20mm SHCS, final tightening will happen after insertion of Z-axis smooth rods in later step +- Insert 1x M5x12mm BHCS and 1x S8-M5 hammernut into the closed hole of both Z-axis upper mounts + +### 8.2 Install Z-axis upper mounts on frame + +Parts + +- 1x prepared Z-axis upper mount A +- 1x prepared Z-axis upper mount B +- 2x M5x12mm BHCS +- 2x S8-M5 Hammernut + +Tools + +- 2.5mm and 3mm allen wrench +- 70mm printed template +- 85mm printed template + +Instructions + +- Insert 2x M5x12mm BHCS and 2x S8-M5 hammernut assembly into frame; one for each upper mount. +- Mount the Z-axis upper mount A and B into frame and onto the previously mounted Z-axis smooth rods from step 5 +- Tighten the M3x25mm SHCS in the Z-axis upper mounts to secure the Z-axis smooth rods +- Use the 70mm printed template to align printed upper Z mount A to front side of frame +- Tighten the M5x12mm BHCS with 3mm allen wrench +- Align the Z-axis upper mount B using the 85mm printed template to measure 85mm from the printed Z upper mount A +- Tighten the M5x12mm BHCS with 3mm allen wrench + +## 9. Y-axis Left and Right + +### 9.1 Prepare XY Idler Assembly Left + +Parts + +- printed XY Idler - Left +- 2x M3 nuts +- 1x M3x20mm SHCS +- 1x M3x30mm SHCS +- 2x teethed idler pulleys +- 5x DIN 433 M3 shim washer + +Tools + +- 2.5mm allen wrench + +Instructions + +<img src="pictures/yaxis_l_xyidler_b001.svg" width="600" /> <br> + +- Step 1 - Insert 2x M3 nuts into printed XY Idler bracket + +| Step 1 - Insert M3 nuts into slots | Step 1.1 - M3 nuts inserted | +| - | - | +| <img src="pictures/yaxis_l_xyidler_c001.png" /> | <img src="pictures/yaxis_l_xyidler_c002.png" width="350" /> | + +- Step 2 - Insert 2x M3 bolts into printed XY Idler bracket + + - Insert the M3x20mm bolt till the end but do not tighten now. It will be tightened in a later step when the 10mm smooth rod is inserted + - Insert the M3x30mm bolt only halfway through + +| Insert M3 bolts | M3 bolts inserted | +| - | - | +| <img src="pictures/yaxis_l_xyidler_c003.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c004.png" width="350" /> | + +- Step 3 - Insert first teethed idler pulley + + - The teethed idler has a bore diameter of 3mm and width of 6mm + +| Insert Idler pulley | Pulley inserted | +| - | - | +| <img src="pictures/yaxis_l_xyidler_c005.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c006.png" width="350" /> | + +- Step 4 - Insert M3 Shim Washers + +| Insert 4xM3 shim washers | Washers inserted | +| - | - | +| <img src="pictures/yaxis_l_xyidler_c007.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c008.png" width="350" /> | + +- Step 5 - Insert second teethed idler pulley in SHCS + +| Insert 2nd teethed idler pulley | Insert M3x30mm SHCS till end | +| - | - | +| <img src="pictures/yaxis_l_xyidler_c009.png" width="350" /> | <img src="pictures/yaxis_l_xyidler_c010.png" width="350" /> | + +- Step 6 - Tighten M3x30mm SHCS + +- Screw in and slightly tighten the M3x30mm SHCS with an 2.5mm allen wrench +- Caution! Do not tighten to the point that the pulleys cannot spin freely! + +| Tighten Bolt with allen wrench | Finished XY Idler assembly | +| - | - | +| <img src="pictures/yaxis_l_xyidler_b006.jpg" width="350" /> | <img src="pictures/yaxis_l_xyidler_c011.png" width="320" /> | + +- Step 9 - Assemble XY Idler Right + +The XY Idler Right is a mirror copy of the XY Idler Left asembly. The required components are the same. The only difference is that the XY Idler printer XY Idler Right is a mirrored version of the XY Idler Left. + + + +### 9.2 Prepare XY Idler Assemby Right + +Parts + +- printed XY Idler - Reft +- 2x M3 nuts +- 1x M3x20mm SHCS +- 1x M3x30mm SHCS +- 2x teethed idler pulleys +- 5x DIN 433 M3 shim washer + +Tools + +- 2.5mm allen wrench + +Instructions + +Repeat steps 1 - 8 for the XY Idler Right assembly + +### 9.3 Prepare XY Motor assembly left + +- Parts required + + - Printed XY Stepper Motor Bracket - Left + - 2x M3 Nut + - 2x M3x20mm SHCS + - 1x Nema17 motor + +- Instructions + + - Insert M3 nut and M3x20mm SHCS into printed XY stepper brackets + - + +### Y-axis Installation - Parts required @@ -495,7 +775,7 @@ Repeat steps 1 - 8 for the XY Idler Right assembly 4. Belt Clamp + X Cable Chain Connector (1) 5. 3mm dia 12mm long Dowel Pins (4) -## 10. Belts Installation +## 10. XY Belts installation - Parts required @@ -516,14 +796,6 @@ Repeat steps 1 - 8 for the XY Idler Right assembly - Pull belt and release to measure belt tension frequency with phone app - Ensure frequency is between 70 and 80 Hz. -## 11. Heated bed installation - -- Parts required - - Mk3 24V (120W) 214x214mm Aluminium Heatbed - - 4x M3x40mm SHCS - - 4x M3 Knurled Nut - - 3mm glass Plate - - 4x Bulldog Clip @@ -589,15 +861,16 @@ Repeat steps 1 - 8 for the XY Idler Right assembly - Parts required - - Cable Chain 10x20mm 400mm long - - Cable Chain 10x20mm 350mm long - - Printed XY cable chain connector + - Cable Chain 10x20mm 400mm long (27 links) + - Cable Chain 10x20mm 350mm long (24 links) + - Printed cable chain connector - Hotend cable - 2pol - 1,5mm2 - 1.6m long - Thermister cable - 2pol - 0.14mm2 - 1.6m long - Part cooling fan cable - 2pol - 0.25mm2 - 1.6m long - Hotend cooling fan - 2pol - 0.25mm2 - 1.6m long - - X Endstop cable - 2pol - 0.14mm2 - 1.6m long - - Extruder motor motor cable - 4pol - 0.5mm2 - 1.6m long + - X Endstop cable - 2pol - 0.14mm2 - 1.7m long + - Extruder motor cable - 4pol - 0.5mm2 - 1.6m long + - Inductive probe cable - 3pol - 1.6m long - Instructions -- GitLab