The build instructions below are divided into two parts, namely pre-assembly and final assembly. In the pre-assembly some of the sub-assmeblies or parts are either prepared or assembled together to ease the final assembly. The numbering system below will be referred to within the build manual by appending each number after the previous number for eg. the LM12UU bearing installation is in step **1.4.1** and can be looked up in the list below as part of the Build Platform assembly > Z-Axis Bearing Holder > LM12UU Bearing.
The build instructions below are divided into two parts, namely pre-assembly and final assembly. In the pre-assembly some of the sub-assmeblies or parts are either prepared or assembled together to ease the final assembly. The numbering system below will be referred to within the build manual by appending each number after the previous number for eg. the LM12UU bearing installation is in step **1.4.1** and can be looked up in the list below as part of the Build Platform assembly > Z-Axis Bearing Holder > LM12UU Bearing. The number in the (#) paranthesis denotes the quantity of the part.
## Pre-Assembly
1. Build Platform Assembly
## Pre-Assembly BOM
1. Build Platform Pre-assembly
1. 2020 Profile 335mm long (2)
2. 2020 Profile 140mm long (2)
3. Corner Brackets 2020 (4)
...
...
@@ -13,10 +13,10 @@ The build instructions below are divided into two parts, namely pre-assembly and
1. LM12UU Bearing (2)
2. M5x10mm Bolt (4)
3. M5 2020 Hammer Nuts (4)
5. Z Nut Bracket
5. Z Nut Bracket (2)
1. M5x10 Bolts (4)
2.M5 2020 Hammer Nuts (4)
3. Trapezoidal Lead Screw Nuts (1)
2. 2020 M5 Hammer Nuts (4)
3. Trapezoidal Lead Screw Nuts 8mm (1)
4. M3x12 Bolts (4)
5. M3 Nut (4)
6. Bed Bracket (4)
...
...
@@ -24,46 +24,104 @@ The build instructions below are divided into two parts, namely pre-assembly and