Skip to content
GitLab
Explore
Sign in
Primary navigation
Search or go to…
Project
O
Open Lab Starter Kit
Manage
Activity
Members
Labels
Plan
Issues
Issue boards
Milestones
Wiki
Code
Merge requests
Repository
Branches
Commits
Tags
Repository graph
Compare revisions
Snippets
Build
Pipelines
Jobs
Pipeline schedules
Artifacts
Deploy
Releases
Package Registry
Model registry
Operate
Environments
Terraform modules
Monitor
Incidents
Analyze
Value stream analytics
Contributor analytics
CI/CD analytics
Repository analytics
Model experiments
Help
Help
Support
GitLab documentation
Compare GitLab plans
Community forum
Contribute to GitLab
Provide feedback
Keyboard shortcuts
?
Snippets
Groups
Projects
Show more breadcrumbs
FCHH Hardware
Open Lab Starter Kit
Commits
f85ea6e8
Commit
f85ea6e8
authored
3 years ago
by
Mohammed Omer
Committed by
hoijui
3 years ago
Browse files
Options
Downloads
Patches
Plain Diff
build manual edits
parent
dd0bc934
No related branches found
Branches containing commit
No related tags found
No related merge requests found
Changes
1
Hide whitespace changes
Inline
Side-by-side
Showing
1 changed file
docs/machines/3DPrinter/Step by Step Assembly.md
+22
-16
22 additions, 16 deletions
docs/machines/3DPrinter/Step by Step Assembly.md
with
22 additions
and
16 deletions
docs/machines/3DPrinter/Step by Step Assembly.md
+
22
−
16
View file @
f85ea6e8
...
...
@@ -464,27 +464,13 @@ Repeat exact same process as in previous Left Side frame subassembly
### 2. Z-axis upper mounts installation (2)
#### Parts required
1.
Preassembled Z upper mount (2)
2.
M5x12mm Bolt (4)
3.
M5 Hammernut (4)
4.
62 mm spacer
5.
Allen wrench #2.5
#### Assembly process
-
Mount Z axis upper mount assembly with spacer placed to front side of frame
-
Insert M5x10 BHCS (2) with Hammer nut (2) into mount and tighten with #2.5 allem wrench
-
Repeat process on right side of frame
### 3. Z-axis lower mounts installation (2)
#### Parts required
1.
Preassembled Z lower mount (2)
1.
Preassembled Z
axis
lower mount (2)
2.
M5x12mm BHCS (8)
3.
M5 Hammernut (8)
4.
62 mm spacer (1)
...
...
@@ -492,11 +478,31 @@ Repeat exact same process as in previous Left Side frame subassembly
#### Assembly process
Use X mm spacer to align lower Z mount
-
Use 62mm spacer to align lower Z mount to front side of frame
-
Tighten M5x12mm BHCS (4) pre-installed on lower Z mount
-
Install M5x12mm BHCS (2) with M5 hammer nut on underside of lower Z mount
-
Install the second lower Z mount on right side following above process
### 4. 8mm rods insertion in Z axis lower mounts
1.
8mm smooth rod (4)
### 2. Z-axis upper mounts installation (2)
#### Parts required
1.
Preassembled Z upper mount (2)
2.
M5x12mm Bolt (4)
3.
M5 Hammernut (4)
4.
62 mm spacer
5.
Allen wrench #2.5
#### Assembly process
-
Mount Z axis upper mount assembly with 62mm spacer placed to front side of frame
-
Insert M5x10 BHCS (2) with Hammer nut (2) into mount and tighten with #2.5 allem wrench
-
Repeat process for second Z axis upper mount on right side of frame
### 5. Build Platform Installation (1)
1.
Heatbed (1)
1.
3mm MK3 Heat Bed (1)
...
...
This diff is collapsed.
Click to expand it.
Preview
0%
Loading
Try again
or
attach a new file
.
Cancel
You are about to add
0
people
to the discussion. Proceed with caution.
Finish editing this message first!
Save comment
Cancel
Please
register
or
sign in
to comment